PriceList for SV-999 Structural Glazing Silicone Sealant for Pakistan Factory

PriceList for
 SV-999 Structural Glazing Silicone Sealant for Pakistan Factory
  • PriceList for
 SV-999 Structural Glazing Silicone Sealant for Pakistan FactoryPriceList for
 SV-999 Structural Glazing Silicone Sealant for Pakistan Factory
  • PriceList for
 SV-999 Structural Glazing Silicone Sealant for Pakistan FactoryPriceList for
 SV-999 Structural Glazing Silicone Sealant for Pakistan Factory
  • PriceList for
 SV-999 Structural Glazing Silicone Sealant for Pakistan FactoryPriceList for
 SV-999 Structural Glazing Silicone Sealant for Pakistan Factory

Short Description:

Description SV – 999 silicone structural sealant is a one-component, neutral curing, designed for glass curtain wall, aluminum curtain wall, glass daylighting roof and metal structural engineering structural assembly silicone sealant. Show the effective physical properties and bonding performance   Key Features 1. 100% silicone 2. No sag 3. Strong bonding strength 4. Water & weatherproof 5. Primerless adhesion to most building materials 6. 25% movement capability   Basic Application...


Product Detail

Attentions

Application

Product Tags

We will devote ourselves to providing our esteemed customers with the most enthusiastically thoughtful services for PriceList for SV-999 Structural Glazing Silicone Sealant for Pakistan Factory, Inspired by the rapid developing market of the fast food and beverage consumables all over the world , We are looking forward to working with partners /clients to make success together .


Description

SV – 999 silicone structural sealant is a one-component, neutral curing, designed for glass curtain wall, aluminum curtain wall, glass daylighting roof and metal structural engineering structural assembly silicone sealant. Show the effective physical properties and bonding performance

 

Key Features

1. 100% silicone

2. No sag

3. Strong bonding strength

4. Water & weatherproof

5. Primerless adhesion to most building materials

6. 25% movement capability

 

Basic Application

1.Glass curtain wall, aluminum curtain wall structure adhesive seal

2.Glass daylighting roof, metal structure engineering

3.Insulating glass bonding

 

Technical data sheet

Test standard Test project Unit value
Before curing——25℃,50%R.H.
  specific gravity g/ml 1.40
GB13477 Flow, sagging   or vertical flow mm 0
GB13477 Operating time min 15
GB13477 surface drying time(25℃,50%R.H.) min 40-60
Sealant curing speed and operating time   will have different with different temperatures and temperature, high   temperature and high humidity can make sealant curing speed faster, rather   low temperature and low humidity are slower.21 days after   curing——25℃,50%R.H.
GB13477 Durometer Hardness Shore A 40
  The ultimate   tensile strength Mpa 1.3
GB13477 Tensile strength(23℃) Mpa 0.8
GB13477 Tensile strength(90℃) Mpa 0.5
GB13477 Tensile strength(-30℃) Mpa 0.9
GB13477 Tensile strength(flooding) Mpa 0.6
GB13477 Tensile strength(flooding   – ultraviolet) Mpa 0.6

 

Certification

GB 16776;ASTM C1184

 

Color

Black

 

Package

300ml in cartridge * 24 per box, 500ml in sausage *20 per box

 

Shelf life

12 months

 

Note

If you want the TDS or MSDS or other details, please contact with our sales person.

 

  • Previous:
  • Next:




  • Flat roof drain installation of Zurn 15″ combination roof drains by ALL TECH Plumbing using our own patented roof drainage system to achieve outstanding flat roof drainage.

    VIDEO OVERVIEW: This was an actual project where the flat roof collapsed under the weight of the accumulated rainwater.

    FLAT ROOF DAMAGE: The cause of the roof collapse were clogged roof drains. The standing rainwater built up and added an excessive load to the flat that it was not designed to handle and subsequently collapsed.

    PREVENTION: The property owners clearly wanted to avoid the same situation from happening again and the simple solution was to make sure that the roof drains received regular maintenance to prevent them from getting clogged.

    HALF THE BATTLE: Just installing new roof drains was not enough. They also wanted to make sure that the roof drains would be lower than the surrounding roof in order to make sure there was no more ponding.

    THE SOLUTION: All Tech Plumbing recommended the roof drainage system shown to ensure the roof drains are lowered.

    ROOF DRAINAGE SYSTEM BENEFITS

    SAVES MONEY…Helps to mitigate any further flat roof damage due to standing rainwater.

    SAVES MONEY…prevents catastrophic damages resulting from a collapsed flat roof

    SAVES MONEY…may eliminate the cost of resloping or replacing the entire flat roof

    IMPROVES the flat roof drains efficiency. Moves the rainwater off the roof more quickly, preventing any rainwater backup.

    The video ends with pictures of the roof drains having been sealed by a professional roofing contractor and that the original problem of a collapsed roof and excessive standing rainwater has been resolved.

    ROOF DRAIN INSTALLATION RESOURCES…..

    This FAST, EASY and COST EFFECTIVE roof drainage system is available at https://www.roofdrainpans.com

    Installation services: https://www.roofdrainsumppans.com/pro-roof-drain-installation.html

    FREE tech support…888 900-9145. 949 297-8689 M-F 8am – 5pm Pacific

    All of our roof drain installation video series….

    https://www.youtube.com/channel/UCdyWSxz11T86_0IRmdLMMxA

    There are three more styles available on our website. Check them out. https://roofdrainsumppans.co

    Related Products

    WhatsApp Online Chat !