Newly Arrival SV-666 General Use Neutral Sealant to Manchester Factory
Short Description:
Description SV-666 neutral silicone sealant is a neutral curing glue single component, the modulus of the. It is specially designed for windows and doors caulking sealing general plastic doors and windows. It has good adhesion to glass and aluminum alloy, and has no corrosion. Where to use It is fit for multiple purpose sealing and bonding applications to form a silicone rubber adhering to adjacent substrates e.g. glass, ceramic, tile, wood and metal. Key Features 1. 100% silicone 2. Eas...
"Quality first, Honesty as base, Sincere service and mutual profit" is our idea, in order to develop continuously and pursue the excellence for Newly Arrival SV-666 General Use Neutral Sealant to Manchester Factory, Welcome any inquiry to our company. We will be glad to establish friendly business relationships with you!
Description
SV-666 neutral silicone sealant is a neutral curing glue single component, the modulus of the. It is specially designed for windows and doors caulking sealing general plastic doors and windows. It has good adhesion to glass and aluminum alloy, and has no corrosion.
Where to use
It is fit for multiple purpose sealing and bonding applications to form a silicone rubber adhering to adjacent substrates e.g. glass, ceramic, tile, wood and metal.
Key Features
1. 100% silicone
2. Easy to use
3. Waterproofing and weatherproofing
4. Primerless adhesion to most building materials
5. 12.5% movement capability
Technical data sheet
Test standard | Test project | Unit | value |
Before curing——25℃,50%R.H. | |||
GB13477 | Flow, sagging or vertical flow | mm | 0 |
GB13477 | surface drying time(25℃,50%R.H.) | min | 30 |
GB13477 |
Operating time | min | 20 |
Curing time(25℃,50%R.H.) | Day | 7-14 | |
Sealant curing speed and operating time will have different with different temperatures and temperature, high temperature and high humidity can make sealant curing speed faster, rather low temperature and low humidity are slower.21 days after curing——25℃,50%R.H. | |||
GB13477 | Durometer Hardness | Shore A | 28 |
GB13477 | The ultimate tensile strength | Mpa | 0.7 |
Temperature stability | ℃ | -50~+150 | |
GB13477 | Movement capability | % | 12.5 |
Certification
JC/T881-2001 12.5E;GB/T14683-2003 12.5E
Color
Black,White,Gray
Package
300ml in cartridge * 24 per box, 590ml in sausage *20 per box
Shelf life
12 months
Note
If you want the TDS or MSDS or other details, please contact with our sales person.
EndurACE -Water Proof and Tear Proof Printing Card
www.Print-it-quick.com
UTVHitchworks.com – Welcome to UTV Hitchworks, Home of the Farmboy. In this video we are demonstrating how to install the Bulkhead Bed Extension for the Kubota RTV-X series vehicles. The first step is to raise the dump bed. Please follow all safety precautions while the dump bed is in the up position. The Bulkhead Bed Extension requires a drill fitted with a 3/8” bit, a 12mm socket driver or a 12mm socket, and a 12 mm wrench. Once the dump bed is raised, take the socket driver and the wrench and remove the two top bolts on the dump bed. This step must be completed on both sides of the dump bed. Make sure the bottom bolt is left in place on both sides. Next, place the Bulkhead Bed Extension into position, lining up the two holes on either side. This step may require more than 1 person. Install the Bulkhead Bed Extension so that the writing is able to be read from behind the vehicle. Reinstall the bolts previously removed through the dump bed and the Bulkhead Bed Extension. Make sure that all four bolts are installed in the same orientation in which they were removed. Once all four bolts are in place, tighten them all fully using the socket driver and wrench. The final step is to drill through the wall of the dump bed using the drill fitted with the 3/8” bit while the bed is still in the up position. Align the drill with the hole in the center of the Bulkhead Bed Extension. The holes on either side of the center hole are optional, if more rigidity is required. Lastly, insert the provided carriage bolt so that the carriage head is on the inside of the dump bed. Tighten fully. The completed installation should look like this image. For questions on installation please call 513-260-3705.