Newly Arrival CV-709 silicone sealant for PV moudels for Islamabad Importers

Newly Arrival  CV-709 silicone sealant for PV moudels for Islamabad Importers
  • Newly Arrival  CV-709 silicone sealant for PV moudels for Islamabad ImportersNewly Arrival  CV-709 silicone sealant for PV moudels for Islamabad Importers
  • Newly Arrival  CV-709 silicone sealant for PV moudels for Islamabad ImportersNewly Arrival  CV-709 silicone sealant for PV moudels for Islamabad Importers
  • Newly Arrival  CV-709 silicone sealant for PV moudels for Islamabad ImportersNewly Arrival  CV-709 silicone sealant for PV moudels for Islamabad Importers

Short Description:

Description CV709 is a high-performance silicone sealant, one-component oxime type room temperature curing silicone rubber, has excellent weather resistance, high thixotropy, after curing for solar components involved in the base material has good caking property, by TUV for environmental requirements of the ROHS, UL E339949   Key Features 1. 100% silicone 2. No sag 3. high thixotropy 4. Water & weatherproof 5. For solar components involved in the base material has good bonding   Basic Ap...


Product Detail

Attentions

Application

Product Tags

"Control the quality by the details, show the strength by quality". Our company has strived to establish a highly efficient and stable staff team and explored an effective quality control process for Newly Arrival CV-709 silicone sealant for PV moudels for Islamabad Importers, With superb service and quality, and an enterprise of foreign trade featuring validity and competitiveness, that will be trusted and welcomed by its clients and creates happiness to its employees.


Description

CV709 is a high-performance silicone sealant, one-component oxime type room temperature curing silicone rubber, has excellent weather resistance, high thixotropy, after curing for solar components involved in the base material has good caking property, by TUV for environmental requirements of the ROHS, UL E339949

 

Key Features

1. 100% silicone

2. No sag

3. high thixotropy

4. Water & weatherproof

5. For solar components involved in the base material has good bonding

 

Basic Application

1.Solar module frame seal

2.The adhesive of the solar energy back to the terminal block

3.General industrial assembly with seal

 

Technical data sheet

Test standard Test project Unit value
Before curing——25℃,50%R.H.
  specific gravity g/ml 1.34-1.40
GB13477 Operating time min 15
GB13477 surface drying time(25℃,50%R.H.) min 40-60
3 days after curing——25℃,50%R.H.
  Temperature range -55~200
GB13477 Durometer Hardness Shore A 40~55
  The ultimate tensile strength Mpa ≥2
GB13477 Breaking elongation % 300-600
  Aluminum bonding shear strength Mpa ≥1.5
Electrical properties
  Breakdown voltage Kv/mm ≥20
  Volume resistance ohm.cm 9E+14
  Dielectric constant   3.1@50Hz

 

Certification

UL E339949; TUV

 

Color

Black, White

 

Package

300ml in cartridge * 24 per box, 500ml in sausage *20 per box

 

Shelf life

12 months

 

Note

If you want the TDS or MSDS or other details, please contact with our sales person.

  • Previous:
  • Next:



  • DINITROL 11003 is a low density, fire proof railway putty according to DIN EN 45545, and is one of DINOL’s newest developments which has received OEM approval for Railway applications and usage.



    The buildup of a warm flat roof starts with a good vapour barrier followed by insulation then more decking or just the roofing materials depends on if you want the roof soft or solid. Just what vapour barrier to use is not that clear. Is the silver foil to the back of the insulation OK to use for the vapour barrier? Is a sheet of plastic OK?
    Go to some manufacturers websites and they will have several different vapour barriers. Unfortunately the answer is “depends on your roof and your property” calculations should be undertaken for each and every project, if not then the better the vapour barrier is, the more chances of it being correct.
    The detailing of the warm roof is very important if gaps in the insulation are left cold bridging can occur and potentially sweating could happen.
    Warm roof technology is still evolving so; please make sure your roof understands what he is doing we find that we get lots of phone call from the public explaining that their roofer has installed a warm roof with ventilation is this correct? NO.

    For more information, please go to my website. https://www.londonflatroofing.co.uk/warm-roof-explained/

    Related Products

    WhatsApp Online Chat !