Factory directly provide Siway SV-602 Epoxy Structural Adhesive A/B for Manila Factories

Factory directly provide Siway SV-602 Epoxy Structural Adhesive A/B for Manila Factories
  • Factory directly provide Siway SV-602 Epoxy Structural Adhesive A/B for Manila FactoriesFactory directly provide Siway SV-602 Epoxy Structural Adhesive A/B for Manila Factories

Short Description:

Description SV-602 is a 2-part structural epoxy adhesive developed for such application as dry fixing cladding. It has strong adhesion to metals, woods, reinforced plastics stone, ceramic and masonry. It is the best choice for bonding parts which must withstand weather, moisture and temperature fluctuations. SV-602 will adhere with minimum surface preparation and has a low coefficient of expansion.   Key Features 1. Room temperature curing Epoxy adhesive 2. Fast cure at room temperature,...


Product Detail

Attentions

Application

Product Tags

To be the stage of realizing dreams of our employees! To build a happier, more united and more professional team! To reach a mutual benefit of our customers, suppliers, the society and ourselves for Factory directly provide Siway SV-602 Epoxy Structural Adhesive A/B for Manila Factories, We welcome customers, business associations and friends from all parts of the world to contact us and seek cooperation for mutual benefits.


Description

SV-602 is a 2-part structural epoxy adhesive developed for such application as dry fixing cladding. It has strong adhesion to metals, woods, reinforced plastics stone, ceramic and masonry. It is the best choice for bonding parts which must withstand weather, moisture and temperature fluctuations. SV-602 will adhere with minimum surface preparation and has a low coefficient of expansion.

 

Key Features

1. Room temperature curing Epoxy adhesive

2. Fast cure at room temperature, <40 min for reaching a tack-free status under standard environment (STD: 23℃, 50% humidity)

3. Mix ratio of 1:1 by volume or by weight

4. Good mechanical property

5. Bonds a wide variety of building materials

6. Good waterproofing and chemical resistance

 

Basic Application

1, the external walls of stone material, ceramic and other hang bond;

2, concrete, ceramics, stone, wood and other prefabricated split, bonding and jointing;

3, concrete, stone and so on crack repair;

4, the structure of the localization, anchor, reinforcement and reinforcement.

 

Technical data sheet

The following data is for reference only and is not recommended for the specification

Shear strength Stainless steel-stainless steel/Standard conditions ≥18   JC887-2001
Pressure shear strength Stone-stone/ Standard conditions ≥12
Stone-stone/ The freeze-thaw cycle 50 times ≥10
Stone – stainless steel/ Standard conditions ≥12
Standard conditions:Temperature=23℃,relative humidity=50%,48 hours curing
attribute SV-602-A SV-602-B SV-602(After mixing)
Colour gray white grey
Density(g/cm³) 1.8 1.8 1.8
Viscosity(PaS) 200-400 150-250  
Effective operating time(23℃) N/A N/A 20min
           

 

Certification

JC 887-2001

 

Color

Part A-Grey Paste/Part B-White Paste

 

Package

9kg/9kg per unit and 15kg/15kg per unit

 

Shelf life

12 months

 

Note

If you want the TDS or MSDS or other details, please contact with our sales person.

  • Previous:
  • Next:



  • Installation Instructions for an ASI Soundproof Door – High Definition version

    The wall that this was installed to was treated with products, too. You can view our video on Soundproofing a Wall (https://www.youtube.com/watch?v=rVtY6MZoFrY) for more information.

    https://www.acousticalsurfaces.com/acoustic_doors/soundproof_doors.htm

    Tools Needed:
    -Level
    -Pencil
    -Tape Measure
    -Utility Knife
    -Cordless Drill
    -Quart-Size Caulk Gun
    -Hammer
    -Installation Kit*
    -Installation Instructions*
    -Heavy Duty Screws*
    -Shims*
    -Backer Rod*
    -Acoustical Sealant*
    -Door Hardware Kit*
    -Door Casing (One installed on door when shipped, other side comes loose)*
    -Door & Jamb*

    *Included in Door Purchase (https://bit.ly/qZQjRh)

    Make sure to inspect the door and included items for any damage prior to installation.

    INSTALLATION INSTRUCTIONS
    1. Unscrew the temporary threshold on the bottom of the door.
    2. Determine which side of the jamb the hinges will be.
    3. Measure and mark hinge locations onto the door frame.
    4. Place a set of shims at each hinge, making sure they are plumb with the level.
    5. Tip the door into place, make sure all is plumb and level.
    6. Remove the two screws in the hinge closest to the door stop.
    7. Repeat for each hinge.
    8. Prop the bottom corner of the door with it swung at 90 degrees so that it holds the jamb tight to the drywall.
    9. Pre-drill the holes from the screws you just removed to prepare for the long screws. (We use a 5/32 bit)
    10. From top hinge down, install the included long screws.
    11. Adjust shims as necessary to ensure the door stays level.
    12. Shim the strike side of the door to get an even reveal on the inside of the door.
    13. Install the backer rod around the gap in the rough opening by pushing it in about an inch deep. You can use a shim to push it in.
    14. Fill the remaining gap with acoustical sealant.
    15. Remove the temporary brace off the bottom of the trim kit.
    16. Maintaining a 1/4″ reveal, attach the trim with the supplied screws.
    17. Nail trim to wall as needed.
    18. Fill holes with wood putty and sand.
    19. Remove the short hardware screws that came shipped from the strike side of the door.
    20. Replace them with the long screws for the strike hardware to secure the framing.
    21. Remove the trim on the hinge side of the door that shipped on the door.
    22. Repeat steps 13-18 on this side of the door.
    23. Install door hardware as specified.
    24. Ensure the door is shut and latched.
    25. Adjust the door seals by locating the Phillips screws on the face of the door seal and turn counter-clockwise to tighten the door seal. This will close the gap between the seal and the door.
    26. Work the way down the seal until all screws are adjusted so that the seal comes in contact with the door slab.
    27. Trim off excess gasket on the strike side of the door jamb at the bottom so that the gasket is flush with the floor.
    28. Adjust the bottom drop seal by loosening the set screw at the top of the drop seal counter-clockwise. When the screw engages the stop on the jamb, it will drop the seal down.
    29. Peel off the backer on the peel-and-stick seal cover panels and pressure fit over door seals. Start with the top and fit the sides into the miter.



    Watch this helpfull video on How To Do Valeys on Your Roof.
    For Further Consultation and Free Roofing Quotes we recommend the Following Roofing Companies By Area:
    If You live in Birmingham AL, then visit: https://RoofersInBirminghamAL.com
    or Watch at Youtube: https://www.youtube.com/watch?v=AAkSpCORzBg
    If You live in Buffalo NY, you can visit https://RoofersinBuffaloNY.com or Watch video:
    If you live in Baltimore MD, then visit https://RoofersInBaltimoreMD.com or Watch Video: https://www.youtube.com/watch?v=7HZHcVLT9ME
    By living in Cleveland Ohio, you can visit: https://RoofersinClevelandOhio.com or Watch Video: https://www.youtube.com/watch?v=ZTxzDQi2dYk

    roofing
    roof shingles
    metal roofing
    diy roofing
    epdm roofing
    types of roofing
    roofing materials
    roofing shingles
    metal roofing systems
    roof repair
    roofs
    residential roofing
    roofing contractors
    roofing metal
    roofing panels
    metal roofing shingles
    how to install metal roofing
    roofing companies
    metal roofing contractors
    roofing tin
    roofing company
    metal roofing prices
    metal roof shingles
    roofing material
    flat roof repairs
    metal roof
    roofing contractor
    metal roofing products
    roofing cost
    standing seam roofing
    duro last roofing
    corrugated roofing panels
    metal roofing material
    roof shingles types
    roof leak repair
    vinyl roofing
    metal roofs
    roof replacement cost estimator
    new roof cost
    corrugated roof panels
    steel roofing
    roofing options
    tin roofing
    roofing cost calculator
    rubber roofing materials
    aluminum roof panels
    roofing costs
    tile roofing
    birmingham roofers
    columbus ohio roofers
    cleveland roofers
    baltimore roofers
    Buffalo NY Roofers
    indianapolis roofers
    If you’re located in Columbus Ohio

    Related Products

    WhatsApp Online Chat !