11 Years Manufacturer Siway PU FOAM for Costa Rica Factories

11 Years Manufacturer Siway PU FOAM for Costa Rica Factories
  • 11 Years Manufacturer Siway PU FOAM for Costa Rica Factories11 Years Manufacturer Siway PU FOAM for Costa Rica Factories
  • 11 Years Manufacturer Siway PU FOAM for Costa Rica Factories11 Years Manufacturer Siway PU FOAM for Costa Rica Factories
  • 11 Years Manufacturer Siway PU FOAM for Costa Rica Factories11 Years Manufacturer Siway PU FOAM for Costa Rica Factories

Short Description:

Description This product is the expansion, moisture curing, has the strong cohesiveness, elastic foam obturator structure; Save work to save time, reduce waste; High bond strength; Bubble can stick in the concrete, wood, metal, plastic, such as base material surface, but not including teflon, silicon resins;   Key Features 1. Noise silencing effect 2. Strong bonding strength 3. Water & weatherproof 4. Primerless adhesion to most building materials   Basic Application 1.Doors and Windows a...


Product Detail

Attentions

Application

Product Tags

We are commitment to offer the competitive price ,outstanding products quality, as well as fast delivery for 11 Years Manufacturer Siway PU FOAM for Costa Rica Factories, We welcome new and old customers from all walks of life to contact us for future business relationships and achieving mutual success!


Description

This product is the expansion, moisture curing, has the strong cohesiveness, elastic foam obturator structure; Save work to save time, reduce waste; High bond strength;

Bubble can stick in the concrete, wood, metal, plastic, such as base material surface, but not including teflon, silicon resins;

 

Key Features

1. Noise silencing effect

2. Strong bonding strength

3. Water & weatherproof

4. Primerless adhesion to most building materials

 

Basic Application

1.Doors and Windows and wall body between the gap filling sealing, fixed bond

2.Language lab, studio, etc when decorating, gap to fill

 

Technical data sheet

Project

Value

Density, Kg/m³,Not less

10

Thermal conductivity,35℃,W/(m·K) no more than

0.050

Dimensional stability(23±2)℃,48,h no more than

5

Operating temperature

-10~+35℃

Optimum operating temperature

+18~+25℃

Temperature range(After curing)

-35~+80℃

Tensile bond strength

kPa

Not less

Aluminum plate

Standard condition,7d

80

Immersion,7d

60

PVC plate

Standard condition,7d

80

Immersion,7d

60

Cement Plate

Standard condition,7d

60

Shear strength,kpa,Not less

80

Foam expansion ratio,Not less

Standard value-10

 

Certification

JC 936-2004

 

Color

White

 

Package

750ml in Bottle * 12 per box

 

Shelf life

12 months

 

Note

If you want the TDS or MSDS or other details, please contact with our sales person.

  • Previous:
  • Next:



  • I did not work for me. :( Maybe I did it to long.

    Instructions I found on the web after I did it. :(

    Firstly you need to boil some water and make sure it is boiling hot.
    Remove the rubber from the case and put in the boiling water for about 30sec – 1 min.
    Remove the rubber from the boiling hot water and put on ice cold water for about 10-20 sec.
    Dry the silicone case with paper towel or cloth and then I hope it will be good as new.



    Installation Instructions for an ASI Soundproof Door – High Definition version

    The wall that this was installed to was treated with products, too. You can view our video on Soundproofing a Wall (https://www.youtube.com/watch?v=rVtY6MZoFrY) for more information.

    https://www.acousticalsurfaces.com/acoustic_doors/soundproof_doors.htm

    Tools Needed:
    -Level
    -Pencil
    -Tape Measure
    -Utility Knife
    -Cordless Drill
    -Quart-Size Caulk Gun
    -Hammer
    -Installation Kit*
    -Installation Instructions*
    -Heavy Duty Screws*
    -Shims*
    -Backer Rod*
    -Acoustical Sealant*
    -Door Hardware Kit*
    -Door Casing (One installed on door when shipped, other side comes loose)*
    -Door & Jamb*

    *Included in Door Purchase (https://bit.ly/qZQjRh)

    Make sure to inspect the door and included items for any damage prior to installation.

    INSTALLATION INSTRUCTIONS
    1. Unscrew the temporary threshold on the bottom of the door.
    2. Determine which side of the jamb the hinges will be.
    3. Measure and mark hinge locations onto the door frame.
    4. Place a set of shims at each hinge, making sure they are plumb with the level.
    5. Tip the door into place, make sure all is plumb and level.
    6. Remove the two screws in the hinge closest to the door stop.
    7. Repeat for each hinge.
    8. Prop the bottom corner of the door with it swung at 90 degrees so that it holds the jamb tight to the drywall.
    9. Pre-drill the holes from the screws you just removed to prepare for the long screws. (We use a 5/32 bit)
    10. From top hinge down, install the included long screws.
    11. Adjust shims as necessary to ensure the door stays level.
    12. Shim the strike side of the door to get an even reveal on the inside of the door.
    13. Install the backer rod around the gap in the rough opening by pushing it in about an inch deep. You can use a shim to push it in.
    14. Fill the remaining gap with acoustical sealant.
    15. Remove the temporary brace off the bottom of the trim kit.
    16. Maintaining a 1/4″ reveal, attach the trim with the supplied screws.
    17. Nail trim to wall as needed.
    18. Fill holes with wood putty and sand.
    19. Remove the short hardware screws that came shipped from the strike side of the door.
    20. Replace them with the long screws for the strike hardware to secure the framing.
    21. Remove the trim on the hinge side of the door that shipped on the door.
    22. Repeat steps 13-18 on this side of the door.
    23. Install door hardware as specified.
    24. Ensure the door is shut and latched.
    25. Adjust the door seals by locating the Phillips screws on the face of the door seal and turn counter-clockwise to tighten the door seal. This will close the gap between the seal and the door.
    26. Work the way down the seal until all screws are adjusted so that the seal comes in contact with the door slab.
    27. Trim off excess gasket on the strike side of the door jamb at the bottom so that the gasket is flush with the floor.
    28. Adjust the bottom drop seal by loosening the set screw at the top of the drop seal counter-clockwise. When the screw engages the stop on the jamb, it will drop the seal down.
    29. Peel off the backer on the peel-and-stick seal cover panels and pressure fit over door seals. Start with the top and fit the sides into the miter.

    Related Products

    WhatsApp Online Chat !