10 Years manufacturer CV-709 silicone sealant for PV moudels Supply to Romania

10 Years manufacturer
 CV-709 silicone sealant for PV moudels Supply to Romania
  • 10 Years manufacturer
 CV-709 silicone sealant for PV moudels Supply to Romania10 Years manufacturer
 CV-709 silicone sealant for PV moudels Supply to Romania
  • 10 Years manufacturer
 CV-709 silicone sealant for PV moudels Supply to Romania10 Years manufacturer
 CV-709 silicone sealant for PV moudels Supply to Romania
  • 10 Years manufacturer
 CV-709 silicone sealant for PV moudels Supply to Romania10 Years manufacturer
 CV-709 silicone sealant for PV moudels Supply to Romania

Short Description:

Description CV709 is a high-performance silicone sealant, one-component oxime type room temperature curing silicone rubber, has excellent weather resistance, high thixotropy, after curing for solar components involved in the base material has good caking property, by TUV for environmental requirements of the ROHS, UL E339949   Key Features 1. 100% silicone 2. No sag 3. high thixotropy 4. Water & weatherproof 5. For solar components involved in the base material has good bonding   Basic Ap...


Product Detail

Attentions

Application

Product Tags

We always stick to the principle "Quality First, Prestige Supreme". We are fully committed to providing our clients with competitively priced quality products, prompt delivery and professional service for 10 Years manufacturer CV-709 silicone sealant for PV moudels Supply to Romania, We are looking forward to establishing cooperative relationships with you. Please contact us for more information.


Description

CV709 is a high-performance silicone sealant, one-component oxime type room temperature curing silicone rubber, has excellent weather resistance, high thixotropy, after curing for solar components involved in the base material has good caking property, by TUV for environmental requirements of the ROHS, UL E339949

 

Key Features

1. 100% silicone

2. No sag

3. high thixotropy

4. Water & weatherproof

5. For solar components involved in the base material has good bonding

 

Basic Application

1.Solar module frame seal

2.The adhesive of the solar energy back to the terminal block

3.General industrial assembly with seal

 

Technical data sheet

Test standard Test project Unit value
Before curing——25℃,50%R.H.
  specific gravity g/ml 1.34-1.40
GB13477 Operating time min 15
GB13477 surface drying time(25℃,50%R.H.) min 40-60
3 days after curing——25℃,50%R.H.
  Temperature range -55~200
GB13477 Durometer Hardness Shore A 40~55
  The ultimate tensile strength Mpa ≥2
GB13477 Breaking elongation % 300-600
  Aluminum bonding shear strength Mpa ≥1.5
Electrical properties
  Breakdown voltage Kv/mm ≥20
  Volume resistance ohm.cm 9E+14
  Dielectric constant   3.1@50Hz

 

Certification

UL E339949; TUV

 

Color

Black, White

 

Package

300ml in cartridge * 24 per box, 500ml in sausage *20 per box

 

Shelf life

12 months

 

Note

If you want the TDS or MSDS or other details, please contact with our sales person.

  • Previous:
  • Next:



  • UTVHitchworks.com – Welcome to UTV Hitchworks, Home of the Farmboy. In this video we are demonstrating how to install the Bulkhead Bed Extension for the Kubota RTV-X series vehicles. The first step is to raise the dump bed. Please follow all safety precautions while the dump bed is in the up position. The Bulkhead Bed Extension requires a drill fitted with a 3/8” bit, a 12mm socket driver or a 12mm socket, and a 12 mm wrench. Once the dump bed is raised, take the socket driver and the wrench and remove the two top bolts on the dump bed. This step must be completed on both sides of the dump bed. Make sure the bottom bolt is left in place on both sides. Next, place the Bulkhead Bed Extension into position, lining up the two holes on either side. This step may require more than 1 person. Install the Bulkhead Bed Extension so that the writing is able to be read from behind the vehicle. Reinstall the bolts previously removed through the dump bed and the Bulkhead Bed Extension. Make sure that all four bolts are installed in the same orientation in which they were removed. Once all four bolts are in place, tighten them all fully using the socket driver and wrench. The final step is to drill through the wall of the dump bed using the drill fitted with the 3/8” bit while the bed is still in the up position. Align the drill with the hole in the center of the Bulkhead Bed Extension. The holes on either side of the center hole are optional, if more rigidity is required. Lastly, insert the provided carriage bolt so that the carriage head is on the inside of the dump bed. Tighten fully. The completed installation should look like this image. For questions on installation please call 513-260-3705.

    Related Products

    WhatsApp Online Chat !