Professional Manufacturer for Siway SV-602 Epoxy Structural Adhesive A/B for Ghana Factories

Professional Manufacturer for
 Siway SV-602 Epoxy Structural Adhesive A/B for Ghana Factories
  • Professional Manufacturer for
 Siway SV-602 Epoxy Structural Adhesive A/B for Ghana FactoriesProfessional Manufacturer for
 Siway SV-602 Epoxy Structural Adhesive A/B for Ghana Factories

Short Description:

Description SV-602 is a 2-part structural epoxy adhesive developed for such application as dry fixing cladding. It has strong adhesion to metals, woods, reinforced plastics stone, ceramic and masonry. It is the best choice for bonding parts which must withstand weather, moisture and temperature fluctuations. SV-602 will adhere with minimum surface preparation and has a low coefficient of expansion.   Key Features 1. Room temperature curing Epoxy adhesive 2. Fast cure at room temperature,...


Product Detail

Attentions

Application

Product Tags

Our products are widely recognized and trusted by users and can meet continuously changing economic and social needs for Professional Manufacturer for Siway SV-602 Epoxy Structural Adhesive A/B for Ghana Factories, It is our great honor to meet your demands.We sincerely hope we can cooperate with you in the near future.


Description

SV-602 is a 2-part structural epoxy adhesive developed for such application as dry fixing cladding. It has strong adhesion to metals, woods, reinforced plastics stone, ceramic and masonry. It is the best choice for bonding parts which must withstand weather, moisture and temperature fluctuations. SV-602 will adhere with minimum surface preparation and has a low coefficient of expansion.

 

Key Features

1. Room temperature curing Epoxy adhesive

2. Fast cure at room temperature, <40 min for reaching a tack-free status under standard environment (STD: 23℃, 50% humidity)

3. Mix ratio of 1:1 by volume or by weight

4. Good mechanical property

5. Bonds a wide variety of building materials

6. Good waterproofing and chemical resistance

 

Basic Application

1, the external walls of stone material, ceramic and other hang bond;

2, concrete, ceramics, stone, wood and other prefabricated split, bonding and jointing;

3, concrete, stone and so on crack repair;

4, the structure of the localization, anchor, reinforcement and reinforcement.

 

Technical data sheet

The following data is for reference only and is not recommended for the specification

Shear strength Stainless steel-stainless steel/Standard conditions ≥18   JC887-2001
Pressure shear strength Stone-stone/ Standard conditions ≥12
Stone-stone/ The freeze-thaw cycle 50 times ≥10
Stone – stainless steel/ Standard conditions ≥12
Standard conditions:Temperature=23℃,relative humidity=50%,48 hours curing
attribute SV-602-A SV-602-B SV-602(After mixing)
Colour gray white grey
Density(g/cm³) 1.8 1.8 1.8
Viscosity(PaS) 200-400 150-250  
Effective operating time(23℃) N/A N/A 20min
           

 

Certification

JC 887-2001

 

Color

Part A-Grey Paste/Part B-White Paste

 

Package

9kg/9kg per unit and 15kg/15kg per unit

 

Shelf life

12 months

 

Note

If you want the TDS or MSDS or other details, please contact with our sales person.

  • Previous:
  • Next:



  • Host, Sarah Rutan: If your home has a tile roof, make sure you’re aware of its specific maintenance needs. Today we’re in San Ramon with Diamond Certified Expert Contributor Tom Rhoads of Roof-Life Construction to learn more.

    Diamond Certified Expert Contributor, Tom Rhoads: Today we’re going to talk about roof tile maintenance. It is important to maintain your tile roof system and drainage system annually. Let’s talk about a few things you can do to keep your roof system functioning for years to come. Most importantly, keep your roof clean. Removing debris and leaves from your roof system is by far the most important thing that you can do. Now that we can see the roof, let’s talk about a few things that you can do on your checklist.

    Look for slipped or migrated tiles. These tiles are usually found on the hips and valleys. They can easily be reinstalled by adhesive and/or drilled and re-nailed. Also look out for cracked rubber collars. These collars are found around your vent pipes. Depending on the flashing itself, you can easily repair this by slipping a new rubber collar over and sometimes replacement of the whole flashing is necessary.

    Let’s talk about tile intersections: where the two tiles come together is by far the biggest problem area on your roof system. On your trim tiles, meaning the ridge tiles or rake tiles, a lot of times the sealant has been compromised by the sun. It cracks and it breaks away, and/ or the membrane that they use at the top would be burned away by the sun as well. Installation of a lead flashing in place of those is a permanent fix.

    Now let’s talk about your valley intersections. The biggest problem. The debris buildup under your valley is the most common source of a leak. This problem will require a roofing professional to come clean the debris out of the valley, re-form the curves on the outer side, and/or an upgrade to that would be to install a triple crown metal, which allows the water to form down three channels instead of one. If you follow these basic tips, you should have no problem keeping your roof system alive for years to come.

    Host, Sarah Rutan: To learn more from local, top rated companies, visit our Diamond Certified Expert Reports at experts.diamondcertified.org.



    This video teaches you how to make a phone case using hot glue. I hope you like it! ;)

    Send your message to us:

    INQUIRY NOW
    • * CAPTCHA: Please select the Heart

    Related Products

    INQUIRY NOW
    • * CAPTCHA: Please select the Tree